Premises and Equipment

Premises:

Nature of Construction and Finishes:

The building is of RCC, having internal partitions of pre-fabricated clean room panels in the manufacturing area, concealed wiring, view panel, windows and doors flushed into the panels/walls.

All the Doors are made of GI material stuffed with PUF insulated and aliphatic painted 0.8 mm to 1.2 mm thickness of the shutter, 1.6mm frame thickness, with view panel.

All the connections and utilities are through SS pendent. SS Pendent are provided in cubicles according to the utility required, like Steam, Compressed Air, Purified water, Potable water, Chill water etc. All the wash areas are provided with GMP trap.

This facility is dedicated for producing Solid Dosage forms and hazardous materials are not used in the manufacturing of formulations in this facility

 

Area

Flooring

Wall

Ceiling

Joints

 Store –Inactive materials

Kota Stone

 Cement plastered wall with acrylic emulsion painted.

RCC roof with Acrylic emulsion Painted

 Floor to wall joint with epoxy wall to wall joint with PVC

Store-Active materials

Kota Stone

 Cement plastered wall with acrylic emulsion painted and clean room panel with PU coated.

RCC roof &

False ceiling with Clean room panel

 Floor to wall joint with epoxy. Wall to Wall joint with PVC   Wall to Ceiling joint with PVC 

Dispensing and Sampling Area

 Kota Stone

 Cement plastered wall with acrylic emulsion painted and clean room panel with PU coated.

RCC roof & false

ceiling with Clean room Panel

 Floor to wall joint with epoxy. Wall to Wall joint with PVC   Wall to Ceiling joint with PVC 

 Non-Core Production Area

 Kota Stone

 Clean room panel

RCC roof &

False ceiling with Clean room panel

 Floor to wall joint with epoxy. Wall to Wall joint with PVC   Wall to Ceiling joint with PVC 

 Core

 Manufacturing Area

 Kota Stone

 Cement plastered wall with acrylic emulsion painted and clean room panel with PU coated.

RCC roof & false ceiling with Clean room Panel

 Floor to wall joint with epoxy. Wall to Wall joint with PVC   Wall to Ceiling joint with PVC 

Primary Packing area

Kota Stone

Cement plastered wall with acrylic emulsion painted and clean room panel with PU coated.(Alu-Alu)clean room panel (Strip & Blister)

RCC roof & false ceiling with Clean room Panel

Floor to wall joint with epoxy. Wall to Wall joint with PVC   Wall to Ceiling joint with PVC 

Secondary Packing Materials Stores

Kota Stone

Cement plastered wall with acrylic emulsion painted and clean room panel with PU coated.

RCC roof & false ceiling with Clean room Panel

Floor to wall joint with epoxy. Wall to Wall joint with PVC   Wall to Ceiling joint with PVC 

 Quality Control

 Ceramic tiles

 Wall with cement plastering and clean room panel with PU coated.

RCC roof & false

ceiling with Clean room Panel

Floor to wall epoxy and wall to wall PVC

Instruments room/Hot Zone/Control sample room/Documentation room

 Ceramic tiles

 Wall with cement plastering and clean room panel with PU coated.

Metal sheet roof & PVC false ceiling with aluminium partition.

Floor to wall epoxy and partition to ceiling with PVC

 Microbiology

 Ceramic tiles

Cement plastered wall with acrylic emulsion painted and clean room panel with PU coated.

RCC roof & false ceiling with Clean room Panel

 Floor to wall joint with epoxy.

 Wall to Wall joint and

 Wall to Ceiling joint with Panel material 

Packing material Stores

Marble flooring

Aluminium partition with PVC false ceiling

Metal sheet roof & false ceiling with PVC

False ceiling to partition joint with PVC coving.

Granulation 3( sachet section)

Marble flooring

Clean room Panel

Metal sheet roof & false ceiling with PVC

False ceiling to partition joint with PVC coving

Terrace- RO & DM water Plant

Vitrified tiles

Metal sheet

Metal Sheet

--

STRATEGY:

 

Value based management is our integral philosophy, directed towards maximizing Long term cash flow and shareholders value.

 

Focus on the company's core segments to build up our position as one of the leading healthcare company. Investments in information technologies to improve planning and control of operation Increased investments in AIR & Training & development to upgrade and broaden the skill base of the organization in consequence with the changing needs.

 

Build flexible cost efficient manufacturing process with in house and alliance partner.